The M8 was developed by United Defense since bought by BAE in the early 1990s and offered to the Army in 1996 as a replacement for the M551 Sheridan light tank used by airborne forces. The vehicle leverages investments the Army made in the M8 Armored Gun System, including its low-profile design, and proven technologies like the M35 105mm cannon, and an auto-loading ammunition system that allows the gun to fire at a rate of 12 rounds per minute. Under the contract, one of two awarded ahead of the Government’s down-select to a final contractor, BAE Systems will produce 12 prototype vehicles during the EMD phase. BAE Systems’ solution combines new technology with proven capability to provide the Infantry Brigade Combat Team (IBCT) with a highly agile, armor-protected platform that delivers overwhelming and precise firepower for use across the spectrum of terrains and operations. Army has awarded BAE Systems a contract worth up to $376 million for the Engineering, Manufacturing, and Development (EMD) phase of the Mobile Protected Firepower (MPF) program and rapid prototyping effort with low-rate initial production options. McCarthy visit BAE Systems and inspect BAE’s Mobile Protected Firepower (MPF) Technically, BAE Systems Mobile Protected Firepower is a tank, but the U.S. Army leadership visited General Dynamics and BAE Systems facilities in Detroit to inspect several promising military programs that continue to progress despite the COVID-19 pandemic. Martin, at the General Dynamics facility in Detriot, Mi. McCarthy, and Vice Chief of Staff of the Army General Joseph M. The new light tank was showcased during visit of Secretary of the Army, Hon. Army Mobile Protected Firepower (MPF) program. On April 22, 2020, BAE Systems has demonstrated its newest light tank that developed for the U.S.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |